chore(deps): update rust crate thiserror to v2.0.20 #18

Merged
rosa merged 1 commit from renovate/thiserror-2.x-lockfile into main 2026-08-20 14:29:59 +00:00
Owner

This PR contains the following updates:

Package Type Update Change
thiserror dependencies patch 2.0.192.0.20

Release Notes

dtolnay/thiserror (thiserror)

v2.0.20

Compare Source

  • Suppress redundant_field_names clippy lint in generated code (#​454)

Configuration

📅 Schedule: (UTC)

  • Branch creation
    • At any time (no schedule defined)
  • Automerge
    • At any time (no schedule defined)

🚦 Automerge: Enabled.

Rebasing: Whenever PR is behind base branch, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Mend Renovate.

This PR contains the following updates: | Package | Type | Update | Change | |---|---|---|---| | [thiserror](https://github.com/dtolnay/thiserror) | dependencies | patch | `2.0.19` → `2.0.20` | --- ### Release Notes <details> <summary>dtolnay/thiserror (thiserror)</summary> ### [`v2.0.20`](https://github.com/dtolnay/thiserror/releases/tag/2.0.20) [Compare Source](https://github.com/dtolnay/thiserror/compare/2.0.19...2.0.20) - Suppress redundant\_field\_names clippy lint in generated code ([#&#8203;454](https://github.com/dtolnay/thiserror/issues/454)) </details> --- ### Configuration 📅 **Schedule**: (UTC) - Branch creation - At any time (no schedule defined) - Automerge - At any time (no schedule defined) 🚦 **Automerge**: Enabled. ♻ **Rebasing**: Whenever PR is behind base branch, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Mend Renovate](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiI0My4yODguMCIsInVwZGF0ZWRJblZlciI6IjQzLjI4OC4wIiwidGFyZ2V0QnJhbmNoIjoibWFpbiIsImxhYmVscyI6WyJyZW5vdmF0ZSJdfQ==-->
chore(deps): update rust crate thiserror to v2.0.20
Some checks failed
renovate/stability-days Updates have met minimum release age requirement
ci/woodpecker/push/test Pipeline failed
ci/woodpecker/pr/test Pipeline failed
fa453118d4
rosa scheduled this pull request to auto merge when all checks succeed 2026-08-15 12:09:25 +00:00
Author
Owner

Branch automerge failure

This PR was configured for branch automerge. However, this is not possible, so it has been raised as a PR instead.


  • Branch has one or more failed status checks
### Branch automerge failure This PR was configured for branch automerge. However, this is not possible, so it has been raised as a PR instead. ___ * Branch has one or more failed status checks
rosa merged commit db5d2f425b into main 2026-08-20 14:29:59 +00:00
rosa deleted branch renovate/thiserror-2.x-lockfile 2026-08-20 14:29:59 +00:00
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
rosa/waifu-calendar!18
No description provided.